What is the installation process for a benching system?

Commercial benching installation involves power raceway positioning, surface level alignment, spine assembly, accessory installation, and cable termination. For a 20-seat back-to-back configuration, allow 1–2 days for installation. Coordinate with the electrical contractor for power feed connections prior to furniture installation. At OfficeFurniture2go.com, we provide turnkey installation services for all benching orders — call 1-800-460-0858 to schedule.